Hannover – Bemerode
AMALIE
The AMALIE new-build project is being built on the edge of the new residential neighbourhood of Kronsrode, right next to the peaceful Kattenbrook Park and the landscape conservation area - your new home between urban flair and a green oasis.
A total of 140 rental flats and townhouses await you, offering you all the advantages of a modern residential complex. Each unit comes with a fitted kitchen, one or two terraces, balconies and/or loggias and much more.
The buildings will be constructed to the energy-efficient KfW 55 standard.
Welcome to Kronsrode - where modern living meets quality of life.
The rental offer includes:
- 93 privately financed flats, ranging from cosy 1-room flats to spacious 4-room flats.
- 12 exclusive townhouses with 4.5 to 5 rooms.
- 35 subsidised flats with 1 to 4-room flats.
- 103 underground car parking spaces, some of which are prepared for e-mobility
The units are equipped with
- Underfloor heating
- Parquet / tiled and/or linoleum flooring
- Fibre optic connection for a perfect home office
- 3-pane thermal insulation glazing
There are also lifts from the underground car park to the flat, cellar rooms, an attractively designed inner courtyard and various bicycle parking spaces.
The modern Kronsrode neighbourhood is rounded off by a primary school, several kindergartens and all the necessary utilities. Several neighbourhood parks and the traffic-calmed, barrier-free design offer additional quality of life. From Amalie it is only approx. 400 m to the nearest train stop, and the nearby Messeschnellweg motorway also offers fast connections to all motorways and to the centre of Hanover and Laatzen. Kronsrode - the ideal starting point.
Location: | Hannover - Bemerode |
---|---|
Rental apartments: | 93 freely financed flats 12 town houses 35 funded flats |
Rooms: | 1 to 5 |
Living space ca.: | from 39 m² to 143 m² |
Rental fee: | From EUR 675,- plus additional costs |
Ready for occupancy: | Haus 1: ready to move in Haus 2: ready to move in Haus 4: aprox. February 2025 Haus 5: aprox. March 2025 Haus 7: December 2024 Haus 8: December 2024 Stadthäuser: aprox. February 2025 |
Project developer: | Wohnungsbau Kronsrode GmbH & Co. KG |
Energy certificate | |
Energy efficiency class: | B |
Energy identity card type: | Requirement certificate |
Heating type: | Floor heating |
Essential energy source: | District heating |
Year of construction according to energy certificate: | 2024 |
Final energy demand: | Building 1: 54 kWh/(m²a) Building 2: 51 kWh/(m²a) Building 7: 54 kWh/(m²a) Building 8: 57 kWh/(m²a) |